A bag-in/bag-out (BIBO) housing can be quoted as part of a heating, ventilation, and air-conditioning (HVAC) modification. Have the facilities engineer identify the housing’s role in the existing system and compare the proposed scope with the project drawings.
Check connections and maintenance space
Request a drawing showing the boundaries of the housing, ductwork, supports, and service access. List what the vendor supplies and what the installation contractor provides. Ask whether the quote includes field coordination and any work needed to restore the existing area.
Verify the supplied assembly
Specify evidence for the selected filter and the installed assembly as separate procurement items. Have the contractor document the completed installation and the facility identify who accepts it and owns the service records.
Separate new supply from existing installation work
- Request a marked boundary drawing and ask the contractor to identify conflicts with existing services.
- Include the actual service clearance and route for removing or replacing parts in the coordinated layout.
- Record which party documents its work and who consolidates the acceptance records for facilities.


























